The short answer

Step 1: Pre-Startup Inspection — Water supply: sufficient, clean, and stable water; Air supply: dry, stable compressed air at >= 6.5 bar...

Standard Operating Procedure for the Gasketing Machine
Standard Operating Procedure for the Gasketing Machine

Step 1. Pre-Startup Inspection

Water Supply: Sufficient, stable, clean water.

Air Supply: Dry, stable compressed air with total supply pressure no lower than 6.5 bar. (Insufficient pressure may cause pneumatic actuators to malfunction, resulting in defective or scrapped parts and, in severe cases, material cross-contamination; excessive pressure may damage pneumatic components.)

Power: Turn on the main power switch.

Ensure the waste bin and wastewater bucket are properly positioned.

Walk around the machine to inspect for any abnormalities such as water leaks, air leaks, or material leaks, as well as any surrounding safety hazards. If any issue is found, identify the root cause and resolve it promptly.

 

Step 2. Starting the Dispensing Machine

1. Turn the electrical cabinet switch to the ON position.

2. The power indicator lights up and the Windows system boots up.

3. Click the KAIWEI Dispensing Software icon on the desktop; the handheld pendant will connect to the industrial PC.

4. Click Reset and allow the machine to recirculate for a set period (approximately 10 minutes).

Step 3. Metering Calibration

The working material for this machine is a flowable two-component liquid polyurethane, designated as Component A and Component B.

1. Preparation: An electronic scale and two disposable cups.

2. Move to the maintenance position (with the key switch in Adjustment mode) and detach the supply valve to be calibrated from the mixing chamber (loosen the three screws).

3. Perform Component A metering calibration: remove the Component A supply valve and clean the valve port thoroughly so that no debris or crystallized residue blocks the opening.

4. On the handheld pendant, press F2 to enter the calibration screen and F3 to select Component A. Turn on and tare the electronic scale, and place a disposable cup beneath the valve port.

Press F1 to start calibration and monitor the pressure reading on the screen to ensure the dosing pressure matches the recirculation pressure (recirculation pressure is shown before dispensing, and dosing pressure during dispensing), keeping the differential within 0.3 bar.

If the differential exceeds 0.3 bar, adjust the recirculation valve and supply valve regulators until the pressure difference stays within 0.3 bar.

Press F2 to edit, enter the actual weighed amount of the dispensed material into the Actual Weight field on the handheld pendant, confirm, and run the metering test again. Once the deviation between the actual weight and theoretical weight is within 0.1 g, calibration is complete.

Component B metering calibration follows the exact same procedure as Component A.

5. Reinstall the supply valves (apply petroleum jelly to the O-ring seals), the stirring rod, and the mixing cup (applying petroleum jelly to the seal during assembly).

Then run one cleaning cycle to verify that the mixing head is properly assembled and to flush any debris out of the mixing chamber.

Step 4. Starting Dispensing Operations

1. Enter the target dispensing dimensions in the Graphics Editor and save.

2. Configure the dispensing parameters (dispensing speed, shut-off timing, valve open/close delay, and agitator speed), determined through process calculation and trial runs.

3. Click Position Settings, enter the workpiece dispensing start-point offset, and save.

4. Dry run (simulation): with the key switch in Adjustment mode, press the Start button to verify that the motion trajectory aligns with the workpiece dimensions.

5. If everything aligns, turn the key switch to Automatic mode and press the Start button to begin dispensing:

Pre-shot (ensures sufficient mixed material inside the mixing chamber) → Dispensing in progress → Flush promptly upon completion (to clear residual material and prevent foaming inside the mixing chamber), then turn the key switch back to Adjustment mode.

For continuous dispensing of identical workpieces, simply press the Start button directly.

6. Save the program file in the Graphics Editor for quick recall on future batches of the same workpiece.

7. DXF file import (a red dot must be marked in the drawing as the dispensing start point).

8. Click Open, select the DXF file, and confirm; once imported, dispensing follows the same steps as above. Switch to Standby mode during idle intervals.

Step 5. Shutdown & Maintenance

Mixing head maintenance after completing production:

1. Move to the maintenance position, remove the mixing cup and stirring rod, take off the O-rings, and soak the parts in dedicated cleaning solvent.

2. Clean the mixing chamber (place a lint-free cloth soaked in cleaning agent inside the mixing chamber for about 10 minutes, then wipe clean).

3. Remove the Component B supply valve, clean the valve port, and apply petroleum jelly.

Shut down the Windows system; once powered down, turn the electrical cabinet switch to the OFF position.

This completes the full operating procedure for the gasketing machine. You are welcome to visit our company at any time—thank you!

 


  • Standard Operating Procedure for the Gasketing Machine
Scope of this article

Technical specifications, document scope and sealing performance require project-specific review and sample validation with KAIWEI engineering.

Equipment information Documentation scope

Next step

Discuss your part with KAIWEI

Share the drawing, material and target output for an application review.

Request an application review
← Prev: What Adhesives and Sealants Are Comp... Back to Technology Frontier Next: Commissioning Procedure for KAIWEI G... → Back to top ↑